--- title: "Bill of materials" slug: "productionmanager-in-a-nutshell-bill-of-materials" updated: 2026-09-30T14:39:52Z published: 2026-09-30T14:39:52Z canonical: "docs.homag.cloud/productionmanager-in-a-nutshell-bill-of-materials" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.homag.cloud/llms.txt > Use this file to discover all available pages before exploring further. # Bill of materials The BOM provides an overview of all components of an [order](/v1/docs/en/productionmanager-kurz-erklaert-auftragsverwaltung) and their properties. ![Übersicht über die Stückliste](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/productionManager-bom-01-de.png?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A56Z&se=2026-11-10T00%3A24%3A56Z&sr=c&sp=r&sig=H9LYNxHwrncQkBM%2FRkxf0qRbTid0Od8Hg2Pv0YhJ1CM%3D) BOM Overview ## Actions Depending on the order status, various actions can be performed at BOM level. If you want [to create a new order](/v1/docs/en/productionmanager-tutorial-erstellen-eines-auftrags) or extend an existing BOM, you can import BOMs. For detailed instructions on the import process, see the [section Importing Data](/v1/docs/en/allgemeines-kurz-erklaert-importieren-von-daten). ![Importieren einer Stückliste](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/productionManager-bom-02-de.png?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A56Z&se=2026-11-10T00%3A24%3A56Z&sr=c&sp=r&sig=H9LYNxHwrncQkBM%2FRkxf0qRbTid0Od8Hg2Pv0YhJ1CM%3D) Importing a BOM In addition, the contents of a BOM can be edited in edit mode or via the pen in the row of the component in question. ![Bearbeiten einer Stückliste](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/productionManager-bom-03-de.png?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A56Z&se=2026-11-10T00%3A24%3A56Z&sr=c&sp=r&sig=H9LYNxHwrncQkBM%2FRkxf0qRbTid0Od8Hg2Pv0YhJ1CM%3D) Editing a BOM BOMs of orders that already have the order status "Production Ready" can be **sent to intelliDivide for optimization (1)** or **exported as a CSV file (2).** For a detailed description of the procedure, see [Exporting a BOM](/v1/docs/en/productionmanager-tutorial-export-einer-stueckliste). ![Exportoptionen](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/productionManager-bom-04-de.png?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A56Z&se=2026-11-10T00%3A24%3A56Z&sr=c&sp=r&sig=H9LYNxHwrncQkBM%2FRkxf0qRbTid0Od8Hg2Pv0YhJ1CM%3D) Export options ## Status of a component In the "Production Status" column of a BOM, the production status of each component is displayed. The status can take the following values: | Status | Status color | Explanation | | --- | --- | --- | | **New** | Light blue | After creating or copying, a part is given the status "New". | | **Ready for production** | Dark blue | After approval, a component is given the status "Ready for Production". | | **In production** | Light Green | After the completion notification in the first workstation, the component is given the status "In Production". | | **Completed** | Dark Green | After the completion notification in the last work center, the component receives the status "Completed". | ## BOM-level fields At BOM level, the following fields are available to describe a component: | N° | Field Name | Description | Example | | --- | --- | --- | --- | | **1** | 2. Cutting dimension width and length | Edging dimension of a component after e.g. coating with linings | 700.0 mm | | **2** | Quantity | Number of components, assemblies or articles to be manufactured | 2 | | **3** | Number planned | Number of components already planned | 0 / 2 | | **4** | Art | BOM level | Production order | | **5** | Article group | Group to which the component belongs | Corpus Pages | | **6** | Article number | Item Number | 499174 | | **7** | Job Name | Order Name | Kitchen | | **8** | Order Item | Order Item Number | 2.0 | | **9** | Order Item Description | The Description field of the parent Order Line | Credenza | | **10** | Job Status | Status of the order in the production process | Ready for production | | **11** | Barcode | External ID/ Barcode of the part | 31032021091114015 | | **12** | Top/bottom topping | Coating on the top or bottom of the component | Oak Veneer 05 | | **13** | Topping top/bottom grain | Direction of the grain of the pavement (none, longitudinal or transverse) | Longitudinal | | **14** | Procurement type | Type of procurement such as purchase or in-house production | Acquisition | | **15** | Description | Description of the item, assembly, or component | Side right | | **16** | Width | Cutting width in mm | 650.0 mm | | **17** | CNC program 1,2,3 | Name (with path) of a CNC program of a component | 4711.mpr | | **18** | Thickness | Thickness in mm | 19.0 mm | | **19** | Label Layout | Name of the label layout for CADmatic | Layout 2 | | **20** | Finished width and length | Finished dimensions in mm | 652.0 mm | | **21** | Completion date (planned) | Planned completion date | 01.04.2025 | | **22** | Production Method | Planned process steps in production | CUT EDG CNC ACE | | **23** | Grouping | Assignment of a component to a specific group | 2.0 | | **24** | ID | Unique identifier assigned by the productionManager | 10536412 | | **25** | Edge (front, back, left, right) | Edge code for each page | ABS_Weiss_2_23_HM | | **26** | Edge thickness (front, back, left, right) | Thickness of an edge in mm | 2.00 mm | | **27** | Edge Graphics | Graphical representation of edge processing | 011:011:000:000 | | **28** | Customer Name | Name of the customer for whom the order is intended | Müller | | **29** | Storage space | Designation of the storage location where the component is stored | Regal01_Fach01 | | **30** | Length | Cutting length in mm | 2200.0 mm | | **31** | Length x Width x Thickness | Cutting dimensions of the component | 2200.0 x 650.0 x 19.0 | | **32** | Delivery date (planned) | Planned delivery date | 01.05.2025 | | **33** | Lots | Name of the parent lot | Kitchen - 25.02.2025 11:36:36 | | **34** | Grain | None, longitudinal or transverse | Longitudinal | | **35** | Material | Material code | P2_Weiss_19.0 | | **36** | Notes | Free note field | Material often damaged | | **37** | Surface (top, bottom) | Surface finish | Lacquered | | **38** | Production status | Status of the component, assembly or article in the production process | Ready for production | | **39** | Feedback | Displays the workstation of the latest feedback. The value is determined by the timestamp of the most recent feedback. | SAWTEQ S-300 | | **40** | Stencil | Name of the stencil layout | 2 pieces (2 x 1):2.1:1:1 | | **41** | Start date (set automatically) | Date of start of production | 01.02.2025 | | **42** | Start date (planned) | Planned start date | 01.01.2025 | | **43** | Parent Order | Order to which a component belongs | Kitchen | | **44** | Controller | Person responsible for the order or component | Hans Maier | | **45** | Additional data (3D model, image, CNC program, top view, label, etc.) | Title of the add-on file | CNC program.mpr | As usual, you can [adjust](/v1/docs/en/allgemeines-kurz-erklaert-konfiguration-von-listen) which columns are displayed in which position to your requirements via the gear wheel. ![Tabelleneinstellungen auf Stücklistenebene](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/productionManager-bom-05-de.png?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A56Z&se=2026-11-10T00%3A24%3A56Z&sr=c&sp=r&sig=H9LYNxHwrncQkBM%2FRkxf0qRbTid0Od8Hg2Pv0YhJ1CM%3D) Table settings at BOM level --- ## References ### Links - [Order management](/v1/docs/en/productionmanager-kurz-erklaert-auftragsverwaltung) - [Create an order](/v1/docs/en/productionmanager-tutorial-erstellen-eines-auftrags) - [Importing data](/v1/docs/en/allgemeines-kurz-erklaert-importieren-von-daten) - [Exporting a BOM](/v1/docs/en/productionmanager-tutorial-export-einer-stueckliste) - [Configuring lists](/v1/docs/en/allgemeines-kurz-erklaert-konfiguration-von-listen)