--- title: "Mounting" slug: "sr-bridge-tutorial-mounting" updated: 2026-07-29T09:32:40Z published: 2026-07-29T09:32:40Z canonical: "docs.homag.cloud/sr-bridge-tutorial-mounting" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.homag.cloud/llms.txt > Use this file to discover all available pages before exploring further. # Mounting The device has the "protection class IP20" and should be installed as protected as possible. ## Necessary tools You will need a power drill, a 6mm drill bit, and a Phillips screwdriver. ## Relevant Device Information > [!WARNING] > **Important note:** The sticker on the back of the device has the necessary information printed on it, which is required for commissioning. Make a note of these or take a photo of the label before installing the device. **Explanation:** - Art. No = HOMAG article number - Serial = The unique serial number of the device - Hostname = address where the device can be opened in the browser. This is made up of the homag-iot-MAC address of the device - Password = device-specific password to access the device interface ![Wichtig: Diese Informationen werden für die Inbetriebnahme benötigt.](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/serviceRemote-Typenschild-Rueckseite_900x600px.jpg?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A44Z&se=2026-11-10T00%3A24%3A44Z&sr=c&sp=r&sig=7ulBjEn4gr25alh6y3aozvGxG2CO5eDTJaF%2FhHUjKzY%3D) Important: This information is required for commissioning. ## Connecting accessories - The power supply is plugged in at port X1. - The network cable is plugged in at LAN1. - The external button is plugged in at port X13. - Please close the unused connections with the plugs provided. - As soon as the power supply is connected to a socket, the computer starts. - The network cable is connected to the hall network or to a free LAN port on a HOMAG Group Internet router. - The external button can be positioned freely (cable length 25 m). ![Wo wird welches Kabel eingesteckt?](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/010-serviceRemote-Anschluss-Zubehoer.jpg?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A44Z&se=2026-11-10T00%3A24%3A44Z&sr=c&sp=r&sig=7ulBjEn4gr25alh6y3aozvGxG2CO5eDTJaF%2FhHUjKzY%3D) Where is which cable plugged in? [Embedded content](https://www.youtube-nocookie.com/embed/UjK7ZU9Fgf4?autohide=1&controls=1&rel=0&enablejsapi=1&origin=https%3A%2F%2Fdocs.homag.cloud) How to connect the individual components correctly! ## Mounting the PC in the bracket - The computer is locked into the DIN rail. The tab to be able to unhook it from the DIN rail must point downwards. - The accessories can be plugged in before or after. ![Der Rechner muss in der Halterung einrasten.](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/005-serviceRemote-Halterung.jpg?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A44Z&se=2026-11-10T00%3A24%3A44Z&sr=c&sp=r&sig=7ulBjEn4gr25alh6y3aozvGxG2CO5eDTJaF%2FhHUjKzY%3D) The computer must snap into the holder. ## Wall mounting - Draw the holes. - Drill the holes with the 6 mm drill bit and then insert the dowels. - Screw in the screws with the Phillips recess – about 3 mm away from the wall. - Hook the bracket into the screws. - After installation, you can peel off the protective film of the HOMAG logo. ![Bohrlöcher anzeichnen.](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/001-serviceRemote-Bohrungen-anzeichnen.jpg?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A44Z&se=2026-11-10T00%3A24%3A44Z&sr=c&sp=r&sig=7ulBjEn4gr25alh6y3aozvGxG2CO5eDTJaF%2FhHUjKzY%3D) Mark drill holes. ## Mounting on the machine - Mark the holes. - ATTENTION: Check beforehand that there are no components behind the sheet metal that could be damaged! - Screw the screws directly into the sheet metal – these are self-tapping. - Hook the bracket into the screws. - After installation, you can peel off the protective film of the HOMAG logo. ## Mounting in the control cabinet/TSN junction box - ATTENTION: Electrically trained personnel necessary! - You can mount the computer inside the control cabinet on a DIN rail. The power supply is either through the supplied power supply or 24V DC from the machine. - 15 mm of space should be kept free around the side of the computer. ![Auch möglich: Installation im Schaltschrank auf einer Hutschiene.](https://cdn.document360.io/43eaea7e-f51c-41df-9b73-bf55e0b1d20d/Images/Documentation/027-serviceRemote-Montage-Schaltschrank.jpg?sv=2026-02-06&spr=https&st=2026-11-09T23%3A24%3A44Z&se=2026-11-10T00%3A24%3A44Z&sr=c&sp=r&sig=7ulBjEn4gr25alh6y3aozvGxG2CO5eDTJaF%2FhHUjKzY%3D) Also possible: Installation in the control cabinet on a DIN rail. ## Mounting without bracket - The computer can also be stored without a holder. The ventilation slots on the back must not be covered.