Rack setup
To set up the shelf, mount the label holders in the middle of each compartment above and below the top LED bar. To do this, you have to remove the protective film from the adhesive strip and press the label holders. Make sure that the opening of the label holders is facing up. For the side compartments, stick the label holders vertically.
Remove the included labels from the packaging and separate the labels along the perforated line. Now place one label at a time in a label holder. We recommend starting with the first label at the top left and then dividing from left to right
To create your own labels, use our label tool.
Power plug in
Now plug in the plug of the multiple socket.
The HOMAG will start to light up after about 1 - 2 minutes.
If everything has been connected correctly, the HOMAG CUBE will light up blue and white and you can continue with the configuration in the app.
You can find out what the individual colour signals mean here.

Setting up the shelf

Go Online
