Rack setup
To set up the shelf, please first slide the dividers into the grooves provided according to your requirements. Use the different sizes of the separators, depending on where you want to store rolls with a smaller or larger diameter.
Then mount the label holders above and below the top LED bar. To do this, you have to remove the protective film from the adhesive strip and press the label holders. Make sure that the opening of the label holders is facing up.
Remove the included labels from the packaging and separate the labels along the perforated line. Now place one label at a time in the label holder in the middle of each compartment. We recommend starting with the first label at the top left and then dividing from left to right.
To visually separate the compartments from each other, we recommend that you insert a label with a blue triangle with the tip in the direction of the compartments at the transition from one compartment to the next.
To create your own labels, use our label tool.
Power plug in
Now plug in the plug of the multiple socket.
The HOMAG will start to light up after about 1-2 minutes.
If everything has been connected correctly, the HOMAG CUBE will light up blue and white and you can continue with the configuration in the app.
You can find out what the individual colour signals mean here.

Setting up the shelf

Go Online
