Documentation Index

Fetch the complete documentation index at: https://docs.homag.cloud/llms.txt

Use this file to discover all available pages before exploring further.

Bill of materials

Prev Next

The BOM provides an overview of all components of an order and their properties.

Übersicht über die Stückliste

BOM Overview

Actions

Depending on the order status, various actions can be performed at BOM level.

If you want to create a new order or extend an existing BOM, you can import BOMs. For detailed instructions on the import process, see the section Importing Data.

Importieren einer Stückliste

Importing a BOM

In addition, the contents of a BOM can be edited in edit mode or via the pen in the row of the component in question.

Bearbeiten einer Stückliste

Editing a BOM

BOMs of orders that already have the order status "Production Ready" can be sent to intelliDivide for optimization (1) or exported as a CSV file (2). For a detailed description of the procedure, see Exporting a BOM.

Exportoptionen

Export options

Status of a component

In the "Production Status" column of a BOM, the production status of each component is displayed. The status can take the following values:

Status

Status color

Explanation

New

Light blue

After creating or copying, a part is given the status "New".

Ready for production

Dark blue

After approval, a component is given the status "Ready for Production". 

In production

Light Green

After the completion notification in the first workstation, the component is given the status "In Production".

Completed

Dark Green

After the completion notification in the last work center, the component receives the status "Completed".

BOM-level fields

At BOM level, the following fields are available to describe a component:

Field Name

Description

Example

1

2. Cutting dimension width and length

Edging dimension of a component after e.g. coating with linings

700.0 mm

2

Quantity

Number of components, assemblies or articles to be manufactured

2

3

Number planned

Number of components already planned

0 / 2

4

Art

BOM level

Production order

5

Article group

Group to which the component belongs

Corpus Pages

6

Article number

Item Number

499174

7

Job Name

Order Name

Kitchen

8

Order Item

Order Item Number

2.0

9

Order Item Description

The Description field of the parent Order Line

Credenza

10

Job Status

Status of the order in the production process

Ready for production

11

Barcode

External ID/ Barcode of the part

31032021091114015

12

Top/bottom topping

Coating on the top or bottom of the component

Oak Veneer 05

13

Topping top/bottom grain

Direction of the grain of the pavement (none, longitudinal or transverse)

Longitudinal

14

Procurement type

Type of procurement such as purchase or in-house production

Acquisition

15

Description

Description of the item, assembly, or component

Side right

16

Width

Cutting width in mm

650.0 mm

17

CNC program 1,2,3

Name (with path) of a CNC program of a component

4711.mpr

18

Thickness

Thickness in mm

19.0 mm

19

Label Layout

Name of the label layout for CADmatic

Layout 2

20

Finished width and length

Finished dimensions in mm

652.0 mm

21

Completion date (planned)

Planned completion date

01.04.2025

22

Production Method

Planned process steps in production

CUT EDG CNC ACE

23

Grouping

Assignment of a component to a specific group

2.0

24

ID

Unique identifier assigned by the productionManager

 10536412

25

Edge (front, back, left, right)

Edge code for each page

ABS_Weiss_2_23_HM

26

Edge thickness (front, back, left, right)

Thickness of an edge in mm

2.00 mm

27

Edge Graphics

Graphical representation of edge processing

011:011:000:000

28

Customer Name

Name of the customer for whom the order is intended

Müller

29

Storage space

Designation of the storage location where the component is stored

Regal01_Fach01

30

Length

Cutting length in mm

2200.0 mm

31

Length x Width x Thickness

Cutting dimensions of the component

2200.0 x 650.0 x 19.0

32

Delivery date (planned)

Planned delivery date

01.05.2025

33

Lots

Name of the parent lot

Kitchen - 25.02.2025 11:36:36

34

Grain

None, longitudinal or transverse

Longitudinal

35

Material

Material code

P2_Weiss_19.0

36

Notes

Free note field

Material often damaged

37

Surface (top, bottom)

Surface finish

Lacquered

38

Production status

Status of the component, assembly or article in the production process

Ready for production

39

Feedback

Last completed workstation in the production process

SAWTEQ S-300

40

Stencil

Name of the stencil layout

2 pieces (2 x 1):2.1:1:1

41

Start date (set automatically)

Date of start of production

01.02.2025

42

Start date (planned)

Planned start date

01.01.2025

43

Parent Order

Order to which a component belongs

Kitchen

44

Controller

Person responsible for the order or component

Hans Maier

45

Additional data (3D model, image, CNC program, top view, label, etc.)

Title of the add-on file

CNC program.mpr

As usual, you can adjust which columns are displayed in which position to your requirements via the gear wheel.

Tabelleneinstellungen auf Stücklistenebene

Table settings at BOM level


References