Bill of materials

The bill of materials provides an overview of all parts of an order including their properties.

Overview of the bill of materials

Overview of the bill of materials

Actions

Depending on the status of the order, different actions can be executed for the bill of materials.

You can import a bill of materials when creating a new order or extending an existing bill of materials. For detailed instructions of how to import files, see importing data.

Importing a bill of materials

Importing a bill of materials

Furthermore, the contents of a bill of materials can be changed in edit mode or by using the pencil icon in the row of the respective part.

Edit a bill of materials

Edit a bill of materials

The bill of materials of an order with the status "ready for production" can be sent to intelliDivide (1) for optimizing or exported as a CSV file (2). A detailed description of the procedure can be found under exporting a bill of materials.

Export options

Export options

Status of a part

The "Production status" column of a bill of materials displays the production status for each part. The status can be set to one of the following values:

Status

Status color

Explanation

New

Light blue

After creation or copying, an order is set to the status "New".

Ready for production

Dark blue

After release, an order receives the status "Ready for production".

In production

Light green

As soon as the part has been reported as finished by its first workstation, its status is set to "In production".

Completed

Dark green

After the part has been reported as finished by the last workstation, the status of the part is set to "Completed".

 

Fields describing a bill of materials

The following properties are available for describing the parts in a bill of materials:

Field name

Description

Example

1

2. Cut size length and width

Trim size of a part after, for example, laminating

700,0 mm

2

Additional data (3D model, image, CNC program, label, top view, ... )

Name of the additional file

CNC-program.mpr

3

Article group

Group to which the part belongs

Carcase sides

4

Barcode

External ID / barcode of the part

31032021091114015

5

CNC program 1,2,3

Name (with file path) of the CNC program of a part

4711.mpr

6

Completion date

Planned completion date

April 1, 2025

7

Customer name

Name of the customer for whom the order is intended

Miller

8

Delivery date (planned)

Planned delivery date

May 1, 2025

9

Description

Description of the article, assembly or part

Right side

10

Edge (front, back, left, right)

Edge code for the respective side

ABS_white_2_23_HM

11

Edge diagram

Graphic representation of edge processing

011:011:000:000

12

Edge thickness (front, back, left, right)

Thickness of an edge in mm

2,00 mm

13

Feedback

Most recent workstation passed in the production process

SAWTEQ S-300

14

Finished length and width

Finished dimensions in mm

652,0 mm

15

Grain

None, lengthwise or cross

Lengthwise

16

Grouping

Assignment of a part to a specific group

2.0

17

Label layout

Name of the label layout for CADmatic

Layout 2

18

Laminate bottom / top

Laminate on the top or bottom of the part

Oak veneer 05

19

Laminate bottom / top grain

Direction of the Laminate's grain (none, lengthwise, cross)

Cross

20

Length

Cut length in mm

2200,0 mm

21

Length x width x thickness

Cutting dimensions of the part

2200,0 x 650,0 x 19,0

22

Lots

Name of the parent lot

Kitchen- 25.02.2025 11:36:36

23

Material

Material code

P2_white_19.0

24

Next order

Order to which a part belongs

Kitchen

25

Notes

Free field for notes

Material is often damaged

26

Order item

Number of the order item

2.0

27

Order name

Name of the order

Kitchen

28

Order status

Status of the order in the production process

Ready for production

29

Person in charge

Person responsible for the order or the part

John Miller

30

Procurement type

Type of procurement such as purchase or in-house production

Purchase

31

Production route

Planned processing steps

CUT-EDG-CNC-ASS

32

Production status

Status of the article, assembly or part in the production process

Ready for production

33

Quantity

Number of articles, assemblys or parts to be manufactured

2

34

Quantity (planned)

Number of the already scheduled parts

0 / 2

35

Start date (set automatically)

Date of production start

February 1, 2025

36

Start date (planned)

Planned date for production start

January 1, 2025

37

Storage location

Name of the storage location where the part is stored

Rack01_shelf01

38

Surface top / bottom

Surface finish

Varnished

39

Template

Name of the template layout

2 parts (2 x 1)

40

Thickness

Thickness in mm

19,0 mm

41

Type

Level in the bill of materials

Manufacturing order

42

Width

Cut width in mm

650,0 mm

As usual, the cogwheel can be used to customize which columns are displayed in which position to suit your requirements.

Table settings for a bill of materials

Table settings for a bill of materials