Bill of materials

The bill of materials provides an overview of all parts of an order including their properties.

Overview of the bill of materials

Overview of the bill of materials

Actions

Depending on the status of the order, different actions can be executed for the bill of materials.

You can import a bill of materials when creating a new order or extending an existing bill of materials. For detailed instructions of how to import files, see importing data.

Importing a bill of materials

Importing a bill of materials

Furthermore, the contents of a bill of materials can be changed in edit mode or by using the pencil icon in the row of the respective part.

Edit a bill of materials

Edit a bill of materials

The bill of materials of an order with the status "ready for production" can be sent to intelliDivide (1) for optimizing or exported as a CSV file (2). A detailed description of the procedure can be found under exporting a bill of materials.

Export options

Export options

Status of a part

The "Production status" column of a bill of materials displays the production status for each part. The status can be set to one of the following values:

Status

Status color

Explanation

New

Light blue

After creation or copying, an order is set to the status "New".

Ready for production

Dark blue

After release, an order receives the status "Ready for production".

In production

Light green

As soon as the part has been reported as finished by its first workstation, its status is set to "In production".

Completed

Dark green

After the part has been reported as finished by the last workstation, the status of the part is set to "Completed".

 

Fields describing a bill of materials

The following properties are available for describing the parts in a bill of materials:

Field name

Description

Example

1

2. Cut size length and width

Trim size of a part after, for example, laminating

700,0 mm

2

Additional data (3D model, image, CNC program, label, top view, ... )

Name of the additional file

CNC-program.mpr

3

Article group

Group to which the part belongs

Carcase sides

4 Article number Number of the article 499174
5

Barcode

External ID / barcode of the part

31032021091114015

6

CNC program 1,2,3

Name (with file path) of the CNC program of a part

4711.mpr

7

Completion date (planned)

Planned completion date

April 1, 2025

8

Customer name

Name of the customer for whom the order is intended

Miller

9

Delivery date (planned)

Planned delivery date

May 1, 2025

10

Description

Description of the article, assembly or part

Right side

11

Edge (front, back, left, right)

Edge code for the respective side

ABS_white_2_23_HM

12

Edge diagram

Graphic representation of edge processing

011:011:000:000

13

Edge thickness (front, back, left, right)

Thickness of an edge in mm

2,00 mm

14

Feedback

Most recent workstation passed in the production process

SAWTEQ S-300

15

Finished length and width

Finished dimensions in mm

652,0 mm

16

Grain

None, lengthwise or crosswise

Lengthwise

17

Grouping

Assignment of a part to a specific group

2.0

18

Label layout

Name of the label layout for CADmatic

Layout 2

19

Laminate bottom / top

Laminate on the top or bottom of the part

Oak veneer 05

20

Laminate bottom / top grain

Direction of the Laminate's grain (None, Lengthwise, Crosswise)

Crosswise

21

Length

Cut length in mm

2200,0 mm

22

Length x width x thickness

Cutting dimensions of the part

2200,0 x 650,0 x 19,0

23

Lots

Name of the parent lot

Kitchen- 25.02.2025 11:36:36

24

Material

Material code

P2_white_19.0

25

Next order

Order to which a part belongs

Kitchen

26

Notes

Free field for notes

Material is often damaged

27

Order item

Number of the order item

2.0

28

Order name

Name of the order

Kitchen

29

Order status

Status of the order in the production process

Ready for production

30

Person in charge

Person responsible for the order or the part

John Miller

31

Procurement type

Type of procurement such as purchase or in-house production

Purchase

32

Production route

Planned processing steps

CUT-EDG-CNC-ASS

33

Production status

Status of the article, assembly or part in the production process

Ready for production

34

Quantity

Quantity of articles, assemblys or parts to be produced

2

35

Quantity (planned)

Quantity of the already planned parts

0 / 2

36

Start date (set automatically)

Date of production start

February 1, 2025

37

Start date (planned)

Planned date for production start

January 1, 2025

38

Storage location

Name of the storage location where the part is stored

Rack01_shelf01

39

Surface top / bottom

Surface finish

Varnished

40

Template

Name of the template layout

2 Teile (2 x 1):2.1:1:1

41

Thickness

Thickness in mm

19,0 mm

42

Type

Level in the bill of materials

Manufacturing order

43

Width

Cut width in mm

650,0 mm

As usual, the cogwheel can be used to customize which columns are displayed in which position to suit your requirements.

Table settings for a bill of materials

Table settings for a bill of materials